![]() ![]() But that’s not the point. The point is to methodically document the control system, clearly and accurately. We know that it’s not likely that you will want an exact reproduction of your system one year from now or beyond. Pendant team members update the drawings in AutoCAD Electrical immediately after completing the commissioning of the system. The Mercedes team had opted to retain the narrow sidepod design on its 2023 car, but Toto Wolff has revealed that the entire body and sidepods could be changed during the season ‘if better solutions are found’. One set of One-Line Drawings, with Red-Pen changes, has been left inside the panel.One set of Coordination Drawings, with Red-Pen changes, has been left inside the panel.One set of Control Drawings, with Red-Pen changes, has been left inside the panel.Verify all devices are laid out as indicated on the coordination drawings.Panel and circuit numbers from house power that feed the control panel(s) have been noted on the incoming feed of the drawings for Red-Pens.Added field wiring has been red-pen added to drawings. ![]() The Pendant checklist includes steps like these for updating the control and coordination drawings during and after the commissioning step: One of Pendant’s checklists, the Startup and Commissioning Checklist, contains specific instructions for producing detailed and accurate final drawing sets that complete the design phase of the project. The Pendant team uses simple checklists throughout the process of producing a new control system. (please note that we are using the term control panel design as a proxy for the design of the entire control system with the panel as the brains) Checklists Are Powerful Tools The control panel design ends when you produce a set of drawings that work a year or more from now. The design phase continues beyond the building, shipping, and installation of the panel. Most importantly, you must accept that the control panel design is not complete when you start to build the panel. It sounds simple enough in concept, but it takes dedication and effort to accomplish. We especially liked this excerpt: “The final control panel design is successful if you can build a duplicate of the control panel a year from now”. If youve been following the polarizing conversations within the. We read an article about control panel design the other day in Control Design magazine. We Are Not System Designers (and Other Random Thoughts On the Scales of Design). When is the Control Panel Design Complete? ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |